We have been providing technical solutions to improve the indoor Air Quality for every type of customer from the Domestic User to Multi National Blue Chip companies.

MasterCool Air Conditioning Ltd was appointed to install Mitsubishi Electric VRF air conditioning systems within the 24-hour Control Centre for the Elizabeth Line Railway Network in South London.
The contract involved working safely at height within a live operational open plan office suspending Cassette Air Conditioning units throughout the space along with tray containment for pipework and electrics.
We also installed a number of additional Cassette systems within other offices and breakout areas over additional 2 x Floors.
The project was completed within an agreed six week timeframe, on time and to the complete satisfaction of the client.